Hindmarsh development for Kainga Ora

Comprehensive site/project management

The 29 new homes are a mix of 3-storey apartments and 4/5 bedroom detached homes. Offsite Manufacturing (OSM) is nothing new to Kainga Ora as one of its many benefits is a reduction in material waste and construction time, providing quality, warm homes at a faster pace than traditional builds.
The Hindmarsh Street Development is a tricky Wellington site with challenging access and multiple building platform levels required so this project will provide a combination of both modular (OSM) and traditional delivery.
On the project Kinetic Electrical was responsible for electrical, aircon, data/comms, MATV, CCTV, door access, intercoms, fire protection type 5 and street lighting. Aspects of the project have required electrical design and build, not just electrical installation. The main switchboards had specific requirements, and these were both designed and manufactured by Kinetic Electrical

Other Projects