Taupo District Council – Wastewater Treatment Plant

Kinetic Electrical Hawkes Bay was engaged to design and develop the following specific services for this project:

  • Development of design and tender principal.
  • Liaise with the electrical power authority to size and locate transformer on site.
  • Provision of all electrical services from the demarcation point of the transformer terminals.
  • Pump house electrical services.
  • Electrical power reticulated to eight pivot irrigators and accessory services.
  • Street lighting.
  • Provision of single mode fibre optic cable installation throughout the site for TCP-IP PLC communications.
  • Installation of a Rockwell PLC control system, including all field controls.
  • Liaison with PLC supplier, and PLC software development company to develop, design, install and commission the system as required.
  • Provision of ‘as built’ and commissioning documentation.
  • Provision of a five year maintenance plan.

Duration – six months
Staff Number Involved – two to six
Challenges – strict resource consent criteria
Undertaken By – Kinetic Electrical Hawkes Bay

To view reference please click here

 

Leave a Reply

Your email address will not be published. Required fields are marked *